Under the Floor (Geothermal Heating and Cooling)

Yesterday we poured the cement slab in the retail area of the store.   After installing the drywall we will strap the floor with 2×4 sleepers, cover the sleepers with 11/8″ Warmboard, install radiant heat, and then a wood floor. But first, before we poured the slab, we had to put in all the pipes and wires!   Planning, coordination, drilling holes in the foundation……

Once the floor is poured, all the pipes and wires will be encased in concrete and correcting mistakes or making changes will be difficult.  First thing yesterday morning the concrete arrived and now we have a floor.   Take a look.

SIDING (NUCEDAR); DENITRIFICATION SYSTEM

We are very excited to be among the first projects in RI to use NuCedar Siding.   Made of recycled PVC NuCedar is beautiful, well engineered, and maintenance free.  We are using three different siding profiles – a panel system (pictured below), board and batten, and traditional clapboards.  Special thanks to Tim, Breck, Ezra, and Jimmy from T & J Construction for taking the time to learn how to use this product and for doing such a thoughtful and careful job! And check out the standing seam metal roof – a tip of the hat to JC, Glen, and the crew from Bradford Standing Seam!

We are also in the midst of installing a denitrification septic system – sized to handle the Charlestown Package Store and a future building that will go up on the site of the old store.   This system is essentially a miniature sewage treatement plant that filters and treats the waste water to make it safe for the environment.